Saturday, February 5, 2011

February Trail Maintenance


Today Larry and I met Foster, Gary
and Bart for breakfast at Chef Troy’s, where we caught up on Foster’s rigorous chemo treatments and found that he is much improved and feeling good again. The rest of us went off to trail 210, our very own Mitchell Ridge and worked non stop til 1 pm.


The graupel fell all day but it was light and we were able to work through it although it was very cold. We raked all the leaves off the steps and then began to haul up and fit large stepping stones into the earth to refurbish the parts of the trail that had eroded away way with time and many footfalls.

Our tools of choice were carefully considered since there were only the four of us and we had to carry them along with our packs. The heavier stones were hoisted and pushed up to the trail from a small waterfall.
We utilized Bart’s flat head shovel with Gary’s strap wrapped around its head as a pulling tool which several of us could pull while Gary hoisted the stone from underneath. The Pulaski worked well as a hoe to loosen the dirt in the trail bed in order to fit the stones in place.

We still have work to do but this slope is not near as slippery as it was. Next month we’ll work toward our Desired Future Condition. HaHaHa.

No comments: